If installing a Chint Meter a CT is not required.
- The Meter will need to be installed and wired just after the Main circuit breaker before feeding the inverter and/or Non-essential loads
- When wiring the meter terminal 1 = Live in and terminal 2 = Live-out
- Terminal 3 = Neutral in and terminal 4 = Neutral out
- A 2-pair comms cable will need to be installed from the meter to the inverter
- On the meter terminal 7 = Meter 485A and will connect to the comms plug terminal 1 = Meter 485A
- Meter terminal 8 = Meter 485B and will connect to the comms plug terminal 2 = Meter 485B
- The Black conductor needs to be terminated on pin 7 – of the comms plug


