Out Fox Eskom: How a Cape Town Printing Plant Transformed Its Energy Future with The ‘BEAST’ (H3 Plus)
The Crisis: Rising Costs and Unstable Power
In Cape Town, South Africa, the local printing plant USS Graphics faced a massive energy crisis. Their monthly electricity bill reached a staggering 350,000 Rand. Frequent power outages forced them to rely on expensive diesel generators that consumed large amounts of fuel. Furthermore, their printing equipment is highly sensitive. These machines cannot handle power dips or the brief interruptions that occur during standard power switches. To Out Fox Eskom, the facility needed a stable, cost-effective, and reliable energy solution.
The Engineering: Unleashing The ‘BEAST’ (H3 Plus)
The project began by metering the entire building to understand its exact energy needs. To achieve these results, USS Graphics partnered with Trust Solar to design a high-capacity solution that fits within a very small physical space. This installation features the power of Fox ESS technology through The ‘BEAST’ (H3 Plus). The system includes a 250 kW inverter installation and a massive 600 kWh battery bank. To capture the South African sun, 390 kW of solar panel capacity now sits on the roof.
The Technology: Advanced Pass-Through Power
The ‘BEAST’ (H3 Plus) utilizes the advanced pass-through technology of the Fox system. This technology allows the system to use all power coming off the roof simultaneously. For example, the system can send 100 kW to charge the batteries while directing 250 kW straight into the building. This process ensures the batteries stay full to power the plant through the evening hours. This seamless management of energy provides the facility with total independence from the grid during peak times.
The Results: Massive Savings and Stability
This technological shift delivered immediate and profound results for the printing plant. USS Graphics achieved a staggering 76% saving on their original electricity bill. Due to these massive savings on such a large monthly expense, the project has an estimated payback period of only two and a half years. Most importantly, the plant now enjoys the stable, continuous power required for its sensitive equipment. The ‘BEAST’ (H3 Plus) provides the long-term energy security needed to thrive in an uncertain landscape. Now is the time to Out Fox Eskom and take control of your industrial energy future.


Jan 23,2026 