We are proud to announce the completion of out 3,6 KW pilot site, we installed 12 x 300 Watt Tenesol panels connected to a 4Kva inverter. The system will produce 7300 KW/Hours of electricity a year saving around 7.4 tons of CO/2 per annum.
We are proud to announce the completion of out 3,6 KW pilot site, we installed 12 x 300 Watt Tenesol panels connected to a 4Kva inverter. The system will produce 7300 KW/Hours of electricity a year saving around 7.4 tons of CO/2 per annum.
© 2024 MSPD - Africa
You must be logged in to post a comment.